Irrigation Start Up Procedure Davis

Procedure Number: OP08
Issue Date: January 23, 2012
Last Revision Date: January 23, 2012


Description:
This document provides a comprehensive process for irrigation spring start up and seasonal
maintenance by Facilities Management on Weber State University Davis Campus.

References:
Irrigation Plans for Davis Campus

Definitions:
Automatic Irrigation System: Irrigation systems that do not require a manual turn on and shut off
at the site box.
Computerized maintenance management system (CMMS): Database that Facilities Management
uses as a work management system.
Manual Irrigation System: Irrigation systems that require a manual turn on and shut off from the
site box.

Responsible Party:
Facilities Management Landscape personnel


Procedure:
Facilities Management will support and maintain a sustainable start-up procedure for irrigation
systems at Weber State University. An annual evaluation of current practices will be performed
to accommodate upgrades and changes in the irrigation systems. 
Beginning April 1, a preventive maintenance work request will be flagged in the CMMS to
indicate the commencement of the spring irrigation start up process. Irrigation systems will be
attended to in sequence beginning at the highest point of elevation for the campus. The following
procedures will be completed by April 15, annually.


A. Returning Water to Irrigation System
1. Shut off all distribution drains (located by the manifolds). Check the Irrigation Maps
provided as there are many distribution drains.
2. Close all drains and valves at the filter system. These are left open during the winter
and must be closed before the system is energized.
3. One 2 inch valve must be closed (located on the 10 feet from valve 1C, 2C 3C
straight east).
4. Slowly open the main water supply at the filter, making sure not to open the valve
fully until after the entire system is energized.
5. Air will be blown out of the system by opening the 2 inch valve mentioned in Item 3.
6. When the air is blown out, slowly close the valve when water appears in the system
7. Continue to process for each valve. Begin from the highest elevation, end at the
lowest elevation. Gravity will aid in filling and energizing the system.
8. Once the valves are closed completely, the system will have received full pressure.
9. Replace all filters for the drip system.

B. Maintaining a Pressurized system
1. Once has pressure gone through each valve, check for operation functions and breaks
that may be present in irrigation lines
2. Check laterals (69+15 laterals, how many exactly?) and drip systems on all three
clocks. All three clocks are located on the northeast wall of the emergency generator
enclosure.
3. Monitor valves, lines and clocks throughout season.
A preventive maintenance work request for operations will be submitted for cleaning out filters
for the drip systems throughout the whole season (work order initiates May 1, one month after
the seasonal start up).

As a note to the irrigation technicians: All irrigation systems including distribution lines are
automatic. The main shut off valve connected to the main filter for the system, must be handled
manually. All main drains are manual.